Responsive Image Banner

Peri speeds renovation work

Premium Content

04 February 2010

Renovation work on the arched bridge over the Rio Tua in Portugal.

Renovation work on the arched bridge over the Rio Tua in Portugal.

A scaffold made up of parts from the Peri Up Rosett Flex system have been used to provide access to a 1940 reinforced concrete arched bridge which crosses the Rio Tua in the Portuguese province of Trás-os-Montes.

The bridge has a complex geometry: a total length of 120 m and 8 m wide with a 80 m wide and 20 m high concrete arch. The superstructure is supported on a number of piers along the two side extension sections.

At present, various restoration measures are being undertaken: strengthening of the roadway surfacing and the T‑beam construction, repairing the concrete and corroded reinforcement, use of epoxy injection to fill the cracks as well as reconditioning the walkways and guardrails. The entire bridge deck will subsequently be re‑coated.

The modular construction method of the scaffold allows it to be adjusted to the bridge geometry and, it is designed to be assembled quickly and safely.

Peri says that its Peri Up scaffold combines the assembly advantages of system scaffolding with the flexibility of the tube and coupler scaffold which is far more time-consuming to erect. The 25 cm grid dimension is designed to allow easy and simple adjustments to a wide range of component geometries. Ledgers and decking can be matched to each other and all scaffold bays can be completely covered with system decking so there are no dangerous.

The erected scaffold has a maximum height of 20 m with the contact area on the ground extending to around 7 m while, at the highest point, the scaffold is 11.75 m wide. The scaffold has been constructed with a minimum of distance around each building component of the bridge including the concrete arch and the different dimensions of the piers.

The scaffolding has provided a safe working environment, which has helped accelerate the renovation work, so that construction time will fall below the originally scheduled seven months.

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Manitou CEO to step down
Recuitment process underway to replace Michel Denis 
Loxam sees signs of stabilisation and increases fleet spending
Europe’s largest rental company said its Q3 results showed positive signs as it invests to ‘rejuvenate’ its fleet
New management team at Manitou
Includes four new regional presidents and four groupwide divisions 
CONNECT WITH THE TEAM
Euan Youdale Editor Tel: +44 (0)1892 786 214 E-mail: [email protected]
Lindsey Anderson Editor Tel: +1 312 929 4409 E-mail: [email protected]
Pete Balistrieri Brand Manager - ALH & SA Tel: +1 414 940 9897 E-mail: [email protected]
Ollie Hodges Vice President, Sales - ALH & SA Tel: +44 (0)1892 786253 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
New for 2026: Expanded coverage

Access International Newsletter + Access Briefing

 

Two essential weekly updates for a fast-growing global access industry.

• Weekly roundup from Access International

• In-depth analysis in the new Access Briefing

• Expanded global news, trends and insight