Responsive Image Banner

ai07080730.xml

Premium Content

19 March 2008

Geda's new 200 kg 200 Z is a lightweight ‘universal hoist’ for scaffolders and contractors. The 1.1 m long, 0,8 m wide cage weighs just 44 kg and requires an area of just 1.5 m by 1.5 m square at the base, with the cage positioned parallel to the building. When it reaches the landing levels it can rotate 90 degrees in either direction for unloading. The mast requires anchors at 4 m intervals and the hoist can be fixed to a scaffold using only one scaffold tube.

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

UK construction ‘starting to crack’, says CPA
Rental association said it can support UK construction, but it needs a stable policy environment and a predictable project pipeline.
Imports of Chinese cranes labelled “manifestly unfair”
Trade investigation call by VDMA and European crane manufacturers
Merlo forecasts ‘decade of opportunity’ in construction and data centres
New report from Merlo America in collaboration with sales intelligence firm BiltData.ai
CONNECT WITH THE TEAM
Euan Youdale Editor Tel: +44 (0)1892 786 214 E-mail: [email protected]
Lindsey Anderson Editor Tel: +1 312 929 4409 E-mail: [email protected]
Pete Balistrieri Brand Manager - ALH & SA Tel: +1 414 940 9897 E-mail: [email protected]
Ollie Hodges Vice President, Sales - ALH & SA Tel: +44 (0)1892 786253 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA