Barin underbridge heads to Bangalore

Premium Content

19 December 2016

Barin AB 12/S during commissioning training in December.

Barin AB 12/S during commissioning training in December.

A new AB 12/S bucket type underbridge inspection unit from Barin is operating in India.

Bangalore’s Planning & Road Asset Management Centre (Pramc) and the Public Works, Ports & Inland Water Transport Department (PWP&IWTD) chose the Barin model mounted on a 3-axle Volvo FM330 Hp 6x2 rigid truck chassis.

As with all in Barin’s range, the AB 12/S uses one lane of the highway in transport position and in work configuration.

Features of the machine included a bridge barrier clearance of 3.5m, a sidewalk clearance of 3m, horizontal outreach underbridge of 12m and a vertical depth underbridge of 16.5m. maximum overhead outreach is 15.2m, while bucket capacity 280 kg and GVW is 16 tonnes.

STAY CONNECTED



Access Briefing

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Winners of International Awards for Powered Access 2026 revealed in Istanbul
Brazilian pioneer Cristian Nacht, Manlift Middle East, İstanbul Vinç, Sunbelt Rentals and Trackunit among winners at the 2026 IAPA awards.
IPAF to ‘fill gap’ in digital processing of training
Peter Douglas, IPAF CEO, addresses digital initiatives at IPAF Summit in Istanbul
Platformder president opens IPAF Summit in Istanbul
Saruhan Günaydın, president of Turkish aerial platform association Platformder, said Turkey is a regional hub, not just a sales opportunity
CONNECT WITH THE TEAM
Euan Youdale Editor Tel: +44 (0)1892 786 214 E-mail: [email protected]
Pete Balistrieri Brand Manager - ALH & SA Tel: +1 414 940 9897 E-mail: [email protected]
Ollie Hodges Vice President, Sales - ALH & SA Tel: +44 (0)1892 786253 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA