Responsive Image Banner

Cement specialist installs Geda hoist

Premium Content
The GEDA BL 2000 hoist in operation at Märker Zement's new cement kiln The BL 2000 Twin hoist installed at Märker Zement’s currently-under-construction cement kiln. (Photo: GEDA)

Germany-based company Märker Zement has installed a hoist platform to enable construction works to a new cement kiln at its site in Bavaria.

Located west of Stuttgart in the Donau-Ries district, Märker Zement is a family-run stone and earth industries specialist that manufactures cement, lime, ready-mixed concrete, precast concrete and gravel products for construction industry contractors across the country.

A BL 2000 Twin hoist from access specialist Geda has been installed at the site to provide to transport building materials, tools and workers up the new 118m-high heat exchanger tower during its construction.

The standard version of the Geda BL 2000 Twin hoist as a large 3.20 x 1.45 x 2.1m platform, a hoisting speed of 40m/min and maximum load capacity of 2000kg.

A construction worker exiting the GEDA BL 2000 hoist (Photo: GEDA)

Described as the “main artery of the building site”, the hoist is also available in a premium model with optional extras including remote maintenance, wind sensors and intelligent call control features.

Geda, which last year installed a permanent hoist from its SH Series on an old 80m high heat exchanger tower adjacent to the new kiln, said, “The transportation of up to 23 persons has been designed to be pleasant, secure and effective.

“The continuous movement of all relevant personnel on this high structure can be ensured and significant efficiency increases have been detected. Bulky goods can also be transported up to a hoisting height of 250m.”

Märker Zement’s new kiln, construction of which began in the summer of 2020, will eventually lead to the replacement of an existing 50-year-old kiln on the site, and will help to secure jobs and improve the impact of the facility on the environment.

Once construction is complete, two Geda platforms will be permanently installed to the kiln’s cooler building. 

A Geda 3700 ZP P and a Geda SH 2500 - consisting of a high-load capacity transport platform - will be installed for future maintenance and repair works in the Spring of this year. 

The GEDA BL 2000 hoist in operation at Märker Zement's new cement kiln (Photo: GEDA)

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Mateco launches multi-services app
Comprehensive app covers equipment configuration, location finding, route planner and information database 
JLG takes hands-on approach to labour shortage
JLG’s approach goes beyond recruitment, it aims to rebuild the talent pipeline in North America 
Zoomlion launches specialist vertical mast trio
New lifts complete vertical mast lift line-up and offer special features 
CONNECT WITH THE TEAM
Euan Youdale Editor Tel: +44 (0)1892 786 214 E-mail: [email protected]
Lindsey Anderson Editor Tel: +1 312 929 4409 E-mail: [email protected]
Pete Balistrieri Brand Manager - ALH & SA Tel: +1 414 940 9897 E-mail: [email protected]
Ollie Hodges Vice President, Sales - ALH & SA Tel: +44 (0)1892 786253 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
New for 2026: Expanded coverage

Access International Newsletter + Access Briefing

 

Two essential weekly updates for a fast-growing global access industry.

• Weekly roundup from Access International

• In-depth analysis in the new Access Briefing

• Expanded global news, trends and insight