Responsive Image Banner

Geda platform helps record Warsaw build

Premium Content

02 February 2015

Geda PH 2032 650 Twin at the Warsaw Spire.

Geda PH 2032 650 Twin at the Warsaw Spire.

A Geda PH 2032 650 Twin is supporting construction work on the highest building in Warsaw, Poland.

The site was originally home to state-owned Bellona, a book and magazine publisher and printer. Now Eastern Europe, a subsidiary of Belgian construction company Ghelamco, is building Warsaw Spire on it.

The core building will be 188 m high, with its spire bringing it to a total height of 220 m and providing around 60000 square metres of usable space, primarily for offices.

Oval in design, the building has been fitted with a tapered external glass façade which covers the structure like a coat.

This façade is open on one side and projects upwards over the core building. It is flanked by two further buildings, each 55 m high with around 20000 square metres of usable space.

In 2011 Warsaw Spire’s architect Jaspers & Eyers Partners won first place in the Eurobuild Awards 2011 for the most challenging project of the year. The total building cost is €250m.

The construction company chose a construction hoist from Ramirent Poland's stock, the Geda PH 2032 650 Twin personnel and materials hoist.

The hoist has a lifting speed of 0-40/65-90 m/min with a maximum lifting height of 400 m. Up to 25 people or 2000 kg of material can be transported on the 1.55 x 3.20 m platform. A PH double car is used on the Warsaw Spire site, meaning two cars - on the left and right side of the mast – can travel upwards and downwards independently.

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Swedish rental veterans create Albanian rental company
New venture aims to bring “Nordic service standards and efficiency to the Albanian market”
Bravi introduces new Leonardo
The third model in the Leonardo range offers a balance between height, capacity and weight 
Sinoboom opens Mexico facility
Production base will be completed in two phases and serve North and South America 
CONNECT WITH THE TEAM
Euan Youdale Editor Tel: +44 (0)1892 786 214 E-mail: [email protected]
Lindsey Anderson Editor Tel: +1 312 929 4409 E-mail: [email protected]
Pete Balistrieri Brand Manager - ALH & SA Tel: +1 414 940 9897 E-mail: [email protected]
Ollie Hodges Vice President, Sales - ALH & SA Tel: +44 (0)1892 786253 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA